New Case Studies
During this period of travel restrictions, we have used the time and resources to increase our library of Case Studies.
Our main intention in this latest batch of Case Studies is to demonstrate the performance of relatively small Huber units when connected to relatively large reactors.
You know the temperature requirements of your process, there is a high probability that a lower powered and less expensive unit will meet those requirements.
Let our Case Studies guide you with an empirical demonstration of performance